Upson - Montreal River; STH 77 to South Junction CTH B, Iron County, WI

Iron County

Owner Reference: 20241210026

Bid Date: 12/10/2024 at 11:00am
19 Days until bid date

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S

The work under this contract shall consist of removal of the existing STH 122 structure over Alder Creek, construction of a new concrete slab span bridge and concrete approach slabs, removal and replacement of pipe culverts, pulverizing of existing pavement, placement of new pipe culverts, HMA paving and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. DBE 3%. Bonds required. Prevailing wages.

Projects/Procurement
 Login or create an account

Owner: State of Wisconsin Department of Transportation (WIDOT) WI

Published 11/13/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450